by Eng. Maurizio Bianco

by Eng. Maurizio Bianco

Team and portfolio

Mauritius White

founder

Maurizio_Bianco
Maurizio is an ambitious person, always focused on innovation and process improvement. Attentive to details and precise in his work, he ensures high quality standards in every project. Determined and proactive, he tackles challenges with a practical and collaborative approach, ensuring effective solutions and lasting results.

Mauritius White

Maurizio Bianco is a civil engineer specializing in structural design and implementation of digital solutions for the construction industry. With a strong academic background and a master’s degree in BIM Management, he has over 7 years of experience on complex projects in Italy and abroad.

He has worked on major infrastructure works, including hospitals, residential towers and innovative projects, distinguishing himself by integrating digital technologies into construction processes. Specializing in BIM, Digital Twin and DfMA strategies, he is an innovation and efficiency-oriented professional, capable of managing multidisciplinary projects and optimizing construction processes.

With a practical and collaborative vision, Maurizio supports companies and teams in the digital transformation of the industry, ensuring modern and sustainable solutions for each project phase.

training

  • Master’s Degree in Structural Civil Engineering -.
  • Master in BIM Management – Politecnico di Milano
  • ISO 19650 BIM Processes Certification – BRE

ICMQ Certificate

Learn more about me

main experiences

  • BIM Coordinator – Brains Digital, Turin
  • BIM/Digital Construction Consultant – WSP, London
  • BIM Consultant/Management Consultant – Mott MacDonald, London
  • Structural Engineer and BIM Specialist – Bryden Wood Technology Ltd, London
  • Researcher in Digital Twin and BIM – University of Melbourne

projects

  • Gaslini Hospital, Genoa – (€250M)
  • Felettino Hospital, La Spezia – (€250M)
  • The London Tunnel Interactive Museum, London – (£400M+)
  • Monkland Hospital, Glasgow – (£3,000M+) – Britain’s largest hospital
  • One Fairchild Tower, London – (£400M)
  • 80 New Bond Street, London – (£25M+) – Mixed Use Development
  • Manchester Airport Expansion – (£100M+) – Offsite Manufacturing Strategy.
  • Elysian Luxury Retirement Homes – (£40M+) – BIM Coordination.
  • NHS Program for 40 New Hospitals in the UK – (£3.7B+) – DfMA Global Strategy
  • Construction Innovation Hub (CIH) Platform Design Programme – (£70M) – Information Management
  • A428 Highways England – (£500M+) – Strategy MMC/DfMA
  • Prosperity Fund BIM Implementation – Strategic projects in Vietnam, Colombia and Peru (£2.5M)
  • Scottish and Southern Energy (SSE) – (£700M+) – BIM and Digital Strategy.
  • National Grid – (£700M+) – BIM and Digital Strategy.
  • Stansted Airport New Terminal – BIM Strategy and Modeling.
  • Heathrow Terminal T5 Extension – BIM Strategy and Modeling.
  • Sumner Street Office Development – DfMA and BIM Strategy.
  • Legal & General Modular Building Assembly Line – DfMA Strategy
  • Lendlease Silvertown Residential Development – DfMA Strategy and BIM
  • Platform 2 and 3 Prototype System Development – DfMA Strategy.
  • Royal Exhibition Building, State of Victoria, Melbourne – Digital Twin and Point Cloud Management.

Discover our projects

Borgo Petra Bianca

Creation of photorealistic renderings for the project, with representations of interior and exterior spaces.

Villa Serenea, Paduledda

Complete architectural and structural design with creation of interior and exterior renderings for an exclusive villa.

Villa Granito, Trinity of Agultu and Vignola

Detailed architectural and structural BIM design accompanied by realistic interior and exterior renderings.

Energy upgrading and laser scanner survey of school buildings

Interventions on 6 schools in Ittiri, Trinità d’Agultu and Santa Maria Coghinas with laser scanner survey and BIM projects for energy improvement.

Laser scanner survey and BIM modeling of schools in Assemini

Digital restitution for Efisio Carboni, Dionigi Scalas and Pascoli+Nivola schools, with creation of AS-IS models.

The London Tunnel Interactive Museum

Participation as BIM Coordinator and BIM Manager for a £400M+ project in London

Monkland Hospital, Glasgow

Contribution to Britain’s largest hospital, with a project value of £3B+.

One Fairchild Tower, London

BIM coordination and management for a £400M iconic project.

80 New Bond Street

BIM coordination and project management for a multifunctional development worth £25M+.

Manchester Airport Expansion

Development of prefabrication strategies and BIM coordination for a £100M+ project.

Elysian Luxury Retirement Homes

BIM management and coordination for a £40M project of luxury residences for the elderly.

Stansted Airport New Terminal

Structural design and BIM management for the new terminal.

Heathrow Terminal T5 Extension

Participation as BIM Coordinator and structural designer for terminal extension.

Gaslini Hospital, Genoa

Participation as BIM Coordinator for a €250M hospital project.

Felettino Hospital, La Spezia

Support as BIM Manager for a €250M innovative hospital.

TWIN+ BY ENG. MAURIZIO BIANCO

Via Cesare Battisti 6, Trinità d’Agultu e Vignola, SS, 07038

VAT number: 02967680907

Order of Engineers (Sassari) Registration no.1674 of 26/03/2023

PRIVACY AND COOKIE POLICY

Privacy Policy
Cookie Policy